Electrical Engineering Equipment
Electrical Equipment Division

Electrical Engineering Equipment

Generation, transmission and distribution equipment inspected at every stage.

Request a Quote
Overview

What We Inspect in Electrical Equipment

Full-stage inspection of power generation, transmission and distribution equipment, including FAT witnessing for transformers, switchgear and substation equipment.

Typical scenarios: Power plant projects, grid infrastructure upgrades, overseas EPC deliveries and utility procurement programs.

Electrical Engineering Equipment
Scope

Detailed Inspection Scope

Power transformers (110kV and above) — FAT witnessing, type test review, routine test verification
Medium-voltage switchgear panels — documentation review, expansion line FAT witnessing
Substation equipment — circuit breakers, disconnectors, site arrival inspection
Generation and transmission equipment — full-stage quality verification
Methodology

Four-Stage Inspection Process

1

Stage 1 - Design & Document Review

Drawing audit, specification compliance, material certification verification

2

Stage 2 - In-Process Inspection

Winding, core assembly, tank fabrication, welding quality checks

3

Stage 3 - Factory Acceptance Test

Routine & type test witnessing, dielectric, temperature rise, partial discharge

4

Stage 4 - Site Arrival & Installation

Transport damage check, assembly supervision, commissioning support

Checklist

Key Inspection Items

  • Applied & induced voltage tests
  • Partial discharge measurement
  • Temperature rise test
  • No-load & load loss measurement
  • Insulation resistance & ratio check
Products

Typical Products

  • Power transformers (up to 500 kV)
  • Medium-voltage switchgear & MCC panels
  • Diesel and gas generator sets
  • Distribution transformers and pad-mounted equipment
  • Solar inverters and combiner boxes
  • High-voltage cables and accessories
Why RBD

Why Choose Our Team

Certified inspectors with electrical engineering backgrounds
Access to calibrated test equipment at all major manufacturing hubs
Real-time digital reporting with photo evidence
Deep knowledge of IEC, IEEE and GB standards
Expedited response for urgent factory surveillance needs
Standards

Applicable Standards & References

IEC 60076
IEEE C57.12
IEC 62271
GB 1094
GB/T 11022

Need Electrical Equipment Inspection?

Tell us about your project and we will arrange a qualified inspector at your factory or site.

Get in Touch
陕ICP备2026026151号-1